US 60: Pinto Creek Bridge Replacement Project | ADOT

Best places to see the Milky Way, meteors and planets
April 6, 2021
GCU coach Bryce Drew watches brother Scott lead Baylor to title
April 6, 2021
Show all

US 60: Pinto Creek Bridge Replacement Project | ADOT

UPDATE: US 60 daytime lane restrictions near the Pinto Creek Bridge scheduled April 7-9
Motorists on US 60 between Miami and Superior will encounter lane restrictions and delays Wednesday, April 7, through Friday, April 9, for the Pinto Creek Bridge replacement project. Flaggers and restrictions are scheduled from 7 a.m. to 6 p.m. on Wednesday and Thursday. They will extend from 7 a.m. to noon on Friday. The restrictions are necessary while crews haul girders for the new bridge to the work site and place them to form the bridge.
While delays will generally be limited to 15 minutes, longer delays are possible during peak travel times. Motorists should proceed with caution, slow down, watch for equipment, and follow the directions of flaggers and law enforcement.
More information about the project is available at azdot.gov/PintoCreekBridge.

US 60: Pinto Creek Bridge Replacement Project | ADOT



Source

Leave a Reply

Your email address will not be published. Required fields are marked *

X